Reports your TSO will accept and your auditor can verify.
IEC 61724 aligned PR, availability, lost-production categorisation, and grid-code event capture — reproducible from raw SCADA, no manual reconciliation.
The challenge
PR, availability, and lost-production numbers go into PPAs, warranty claims, monthly TSO reports, and quarterly board packs. Each consumer wants the number computed slightly differently. Today that's reconciled with spreadsheets, and every refresh introduces drift between what the OEM reports, what the asset manager reports, and what the regulator sees.
Meanwhile grid-code events (LVRT, HVRT, frequency excursions, reactive-power compliance) need to be captured at sub-second resolution and held for years — and most CMS platforms weren't designed for that retention.
What success looks like
How SolarTwin delivers it
- IEC 61724 PR calculation — temperature-corrected, irradiance-weighted, with clipping and curtailment exclusions configurable per PPA.
- Lost-production accounting — every unavailable period is categorised, with reason code, duration, and lost kWh estimate.
- Sub-second event capture for grid-code events — LVRT, HVRT, voltage and frequency excursions, reactive-power dispatch responses.
- Reproducible reports — every report carries the query, the version of the rules, and the version of the data it was generated from.
- Audit-grade history — full time-series retention; no silent down-sampling.
- API + scheduled exports — TSO-formatted CSVs, OEM templates, custom Excel packs all land in the right inbox on the right day.
Where this lands first
- End-of-quarter reporting cycles — replace the spreadsheet reconciliation with a single source.
- Warranty disputes — when the OEM and the operator disagree, both can re-derive the number from the same raw data.
- Grid code reviews — fast access to a specific event's sub-second waveform.
What you need to start
- SCADA register mapping for each inverter model (we have starter templates for SunSpec and the common OEMs).
- The PPA / warranty definitions you have to report against.
- The TSO templates and submission cadence.
See a clean PR number on your own data
Send us a month of SCADA history. We'll regenerate the IEC 61724 PR and show you a reproducible report.
Book a walkthrough